OCL completed the installation of over 6,000 CAT6A data outlets for Fisher & Paykel Healthcare’s new building in East Tamaki.

​

This job included the build of a main server room and six comms rooms located throughout the building.  OCL installed an extensive fibre optic and copper backbone network between the comms rooms complete with “disaster recovery” routes.

​

The construction programme for this building was over 2 years.  While only one level (excluding basement carpark) the floor plate is in excess of 53,000 sqm.  In addition to the size of the floor plate, the ceilings were high. This required a large proportion of work to be carried out with our in-house EWP’s and mobile scaffolds.

​

The result of OCL and other trades involvement in the construction of this building is a fantastic modern Green Star Accredited building that is cabled for the future.